Asphalt Replacement and Removal
Severe sub grade deficiencies may require complete
removal of part or all of the pavement and base material.
After excavation and removal, pre-existing conditions
in the sub grade such as excess moisture, shallow utility lines, missing
aggregate base, or incorrectly prepared sub grade may require additional
steps in the base preparation.